A coordinated, design-stage proposal for a 35-kanal parenteral (LVP/SVP) IV fluids facility โ€” master planning, 3D visualization, equipment boards and engineering drawings presented as a single client package.

0Usable plot (sq ft)
0Scheduled built area
0Pallet positions
0Plot (Kanals)
01 โ€” Project Overview

A compact, phased sterile-manufacturing campus

The proposed Aqua Pure IV facility is a single-storey (with mezzanine services) parenteral manufacturing and logistics campus developed from the AQI-D4 master plan. Process flow runs west-to-east: utility & personnel entry, compounding, ISBM blow-fill-seal, sterilization, visual inspection and packaging, feeding a central high-bay warehouse. All figures below are transcribed from the issued master-plan drawing and are presented as indicative / design-stage unless otherwise noted.
๐Ÿ“

Site & building

  • Usable plot area: 195,050 sq ft
  • Total scheduled area: 138,335 sq ft
  • Remainder (roads/setbacks): 56,715 sq ft (โ‰ˆ29%)
  • Overall site: 218,956 ร— 232,303 mm
๐Ÿญ

Process core

  • Compounding: twin 15,000 L SS316L tanks
  • ISBM blow-fill-seal IV bottle line
  • Water-bath terminal sterilizer / autoclave
  • Automatic visual inspection (VIM)
  • Robotic palletizing & cartoning
๐Ÿ“ฆ

Warehousing

  • Finished-goods: 3,564 pallets
  • Raw-material: 288 pallets
  • Reserved raw-material: 1,188 pallets
  • Total indicated: 5,040 pallet positions
  • Five-tier VNA high-bay racking

Area schedule (from AQI-D4)

ZoneArea (sq ft)Kanals
Utility block6,4601.18
Production36,2756.66
Packing hall10,0001.83
Raw-material store6,6501.22
Reserved raw-material store20,3503.73
Finished-goods store52,7809.69
QC, admin & production entrance5,8201.06
Total scheduled138,33525.40

Note: the difference between usable plot (195,050 sq ft) and scheduled area (138,335 sq ft) is 56,715 sq ft, covering roads, parking, circulation, setbacks and future development โ€” not formally reconciled in the schedule.

03 โ€” Equipment Boards

Eight process & utility equipment boards

Dedicated 1:1 presentation boards for the core process lines and utility systems. Each links into the same full-size lightbox.

04 โ€” Engineering Drawings

Component & layout drawings

Rendered layout / equipment drawings supporting the master plan โ€” master plan sheets, BFS-ISBM line, VIM envelope, WFI tanks, autoclave room and utility/process layouts.

05 โ€” Process Flow

West-to-east sterile production sequence

The process is arranged linearly from the utility / personnel entrance toward the packing and warehouse ends of the building.

  1. 1

    Utilities & entry

    West edge: PW/WFI generation, power inlet, QC/admin controlled personnel entrance.

  2. 2

    Compounding

    Twin 15,000 L SS316L tanks on an elevated stainless platform; dispensing & raw-material airlocks to the south.

  3. 3

    ISBM blow-fill-seal

    North-central: bottle moulding, filling & sealing in a Grade A/B laminar-flow enclosure.

  4. 4

    Sterilization

    Central-east: water-bath terminal autoclave, loading/cooling zones, Grade B/D corridors.

  5. 5

    Inspection & packing

    Automatic visual inspection, re-inspection conveyors, dual cartoning circuits (JDZ-320P).

  6. 6

    Warehouse & dispatch

    Central high-bay 3,564-pallet store, four truck docks, robotic palletizing.